Blogs

Follow Sinoma Energy Saving to learn about the latest information of the company

Overseas war "epidemic", Nigeria's new materials company anti-epidemic construction is not wrong.


Release date:

2020-11-30

Author:

Source:

In order to implement and promote the overall deployment of the national "One Belt, One Road" and "International Capacity Cooperation" initiatives, as well as China National Building Materials Group's "limited, relevant, and diversified" development ideas and the implementation of the "six ones", deepen international operations, and accelerate production capacity "Going out" pace, Sinoma Energy Conservation (Wuhan) Co., ltd and Sinoma Construction Co., Ltd. jointly invested in the construction of China Building Materials Nigeria New Materials Co., Ltd. (hereinafter referred to as "Nigeria New Materials Company") in the global severe anti-epidemic situation, to promote the construction of calcium silicate board production line.

Heat

Point

New

Smell.

In order to implement and promote the overall deployment of the national "One Belt, One Road" and "International Capacity Cooperation" initiatives, as well as China National Building Materials Group's "limited, relevant, and diversified" development ideas and the implementation of the "six ones", deepen international operations, and accelerate production capacity "Going out" pace, Sinoma Energy Conservation (Wuhan) Co., ltd and Sinoma Construction Co., Ltd. jointly invested in the construction of China Building Materials Nigeria New Materials Co., Ltd. (hereinafter referred to as "Nigeria New Materials Company") in the world.Under the severe anti-epidemic situation, go all out to promote the construction of calcium silicate board production line.

 

Since the outbreak,NIGERIAN NEW MATERIALS COMPANY TO GROUP REQUIREMENTS, rapid response, serious study of epidemic prevention relatedTextpiece of spirit, effectively take strict prevention and control of the epidemic as the firstit is necessary to work hard and actively implement various epidemic prevention measures,Minimize the impact of the epidemic on project construction.The company has always maintained close contact with the local government, in accordance with the local government epidemic prevention guidance documents, active coordination, overall deployment, to protect the safety of employees, and arrange for local employees to be isolated in batches, in a semi-closed way to gradually resume work and production.

Strictly implement epidemic prevention and control procedures, reserve all kinds of living and epidemic prevention materials, and take multiple measures to ensure 0 infection.

1. All people must wear masks, and the distance between people is more than 1 meter.

2. Monitor the temperature of employees twice a day.

3. Disinfect before returning to the office area.

4. Kill the living and office areas twice a day.

 

Affected by the epidemic, there is a shortage of multiple jobs on site, but with the joint efforts of everyone, the project construction is progressing in an orderly manner:

1, the main frame of the office building is basically completed, and the top pouring is about to be carried out.

2. The main structure of the dormitory building has been completed and is currently under renovation.

3. Basic construction of the main workshop.

4. Arrived steel structure of main plant.

 

Nigeria New Materials Company, in accordance with the times, to adhere to the original heart and mission of the political responsibility to do a good job in epidemic prevention and control and safety construction, although in the face of many difficulties and challenges, but the company's staff firm confidence, concerted efforts, in the same boat, resolutely build a strong overseas defense line, in order to win the epidemic in an all-round way, the smooth completion of the 2020 target task to work hard!

Keywords: