Hubei │ 12 million ㎡, Wuhan 2021 development of assembly building work points issued
Release date:
2021-04-02
Author:
Source:
Green Prefabricated Building Industry Branch
In order to implement the concept of ecological civilization construction and green development put forward by the 19th CPC National Congress, promote the green development and high-quality development of urban and rural construction, promote the comprehensive transformation and upgrading of the construction industry with the development of prefabricated buildings, and achieve a good start to the 14th five-year Plan, this work point is formulated in accordance with the requirements of the state, province and city to develop prefabricated buildings, and in combination with the actual situation of our city.

Key points of the development of prefabricated buildings in Wuhan in 2021
In order to implement the concept of ecological civilization construction and green development put forward by the 19th CPC National Congress, promote the green development and high-quality development of urban and rural construction, promote the comprehensive transformation and upgrading of the construction industry with the development of prefabricated buildings, and achieve a good start to the 14th five-year Plan, this work point is formulated in accordance with the requirements of the state, province and city to develop prefabricated buildings, and in combination with the actual situation of our city.
1. strict implementation scope and clear work objectives
Scope of (I) implementation
1. Housing construction
All central urban areas, Wuhan East Lake New Technology Development Zone, Wuhan Economic and Technological Development Zone, City East Lake Eco-tourism Scenic Area, Wuhan Airport Economic and Technological Development Zone, Yangtze River New City, New City People's Government, Urban Development Zone, Wuhan Panlong City All new civil buildings within the economic development zone, Wuhan Yangluo Economic Development Zone, and Sino-French Wuhan Ecological Demonstration City should adopt prefabricated building standards for planning, design and construction.
Public welfare public buildings invested by the city's government and independent affordable housing projects should adopt prefabricated building standards for planning, design and construction. Krishman
Prefabricated steel structures are preferred for public buildings and industrial buildings such as hospitals and schools.
2. Municipal infrastructure
Subway tunnel enclosure structure, urban road non-motorized lanes, drainage pipe network in principle, the use of assembly-type construction.
(II) work objectives
The construction area of the city in accordance with the assembly-type construction is not less than 12 million square meters. The target tasks for the application area of newly started assembly-type civil buildings, industrial buildings and municipal infrastructure in each district are detailed in Annex 2.
1. The city's newly started fabricated civil construction area shall not be less than 8.5 million square meters.
2. Fabricated steel structures are preferred for industrial buildings. The industrial construction area of the city using prefabricated steel structure is not less than 1.5 million square meters.
3. The application area of subway tunnel enclosure structure shall not be less than 1.5 million square meters; the application area of municipal infrastructure such as urban road non-motorized vehicle lanes, drainage pipe network, urban road bridges, and comprehensive pipe corridors shall not be less than 500000 square meters.
4. Vigorously promote the demonstration of assembly-type construction projects. Each district to determine the assembly-type construction project demonstration not less than 2.
The following new civil buildings in (III) may not be constructed by assembly.
1. Civil buildings with a planned total construction area of less than 5000 square meters and ancillary facilities of construction projects;
2. Construction projects that exceed the maximum applicable height specified in the relevant technical standards for prefabricated buildings;
3. Residential buildings with concrete structures with a height of more than 100 meters (excluding 100 meters);
4. Sales offices, clubs (activity centers), kindergartens, shops and other independent supporting buildings with non-residential functions in residential building projects, and the following two conditions are all met: ① the total above-ground construction area of supporting buildings shall not exceed 10000 square meters; ② the above-ground construction area of single buildings in supporting buildings shall not exceed 3000 square meters;
5. Emergency rescue works and confidential works determined by the municipal and district governments.
2. strict approval gate, promote the project landing
(I) strict project approval. The development and reform department reviews whether the prefabricated building requirements are implemented in the feasibility study report for government-invested housing construction projects in accordance with policies and regulations. The housing security and housing management department shall, in conjunction with the development and reform management department, put forward the requirements for the construction of prefabricated buildings in accordance with the requirements of the construction plan when issuing the construction plan, and specify that 100 shall be constructed in accordance with prefabricated buildings and the assembly rate shall not be less than 50%. (Responsible units: District (Development Zone) People's Government (Management Committee), Municipal Development and Reform Commission, Municipal Housing Management Bureau)
(II) strict land transfer and planning approval. In accordance with relevant regulations, the natural planning management department shall, in the construction land planning conditions, specify the construction requirements for prefabricated buildings for projects within the scope of implementation, and specify that 100 shall be constructed in accordance with prefabricated buildings and the assembly rate shall not be less than 50%; Continue to implement the requirements specified as "prefabricated buildings" in the "Construction Project Planning Permit" in accordance with the requirements of the planning conditions. (Responsible units: District (Development Zone) People's Government (Administrative Committee), Municipal Natural Resources Planning Bureau)
(III) strict construction drawing review and construction permit management. Urban and rural construction management departments and administrative examination and approval departments should include prefabricated buildings in the review of construction drawing design documents, and continue to implement the "prefabricated buildings" in the "Construction Drawing Design Document Review Certificate" and "Construction Project Construction Permit" Remarks Requirements. (Responsible unit: District (Development Zone) People's Government (Administrative Committee), Municipal Urban Construction Bureau)
(IV) strict construction process and completion acceptance supervision. The urban and rural construction management departments should strictly implement the "Key Points for Quality and Safety Supervision of Prefabricated Building Construction in Hubei Province", strengthen the quality and safety supervision of the prefabricated building construction process, and incorporate the implementation standards and assembly rate indicators of prefabricated buildings into the daily supervision and acceptance supervision. Implement quality and safety supervision requirements in accordance with relevant standards, specifications and regulations, and urge construction units, construction units, supervision units, survey units, design units, and assembly component production enterprises and other participating units to perform the main responsibility of quality and safety management. (Responsible unit: District (Development Zone) People's Government (Administrative Committee), Municipal Urban Construction Bureau)
3. and improve the management system and implement policies and measures
The (I) evaluates and revises the "Notice of the Municipal People's Government on Further Accelerating the Development of Prefabricated Buildings" (Wu Zheng Gui [2017] No. 8), clarifies the development goals of the "14th Five-Year Plan", further improves policy measures and supervision and management systems, and promotes the green and high-quality development of urban and rural construction with new construction industrialization. (Responsible unit: Municipal Urban Construction Bureau)
(II) strictly implement various policies and measures for prefabricated buildings. Departments of planning, urban construction, housing management, and industry and information technology should actively implement preferential policies such as floor area ratio accounting, housing presale, fiscal and tax fund support, cost accounting, enterprise transformation, transportation, and special fund support, uniform implementation of the horizontal projection area of the prefabricated part of the exterior wall of the prefabricated building (not exceeding 3% of the construction area of the single prefabricated building unit +/-0) is not included in the plot ratio accounting of the transaction plot, the proportion of presale funds supervision and the preferential policy of presale licensing. (Responsible unit: district (development zone) people's government (management committee), relevant municipal functional departments)
(III) the strict implementation of the "Wuhan City Assembly Building Construction Management Implementation Measures" (Wucheng Construction Regulations [2020] No. 1), strengthen the management of assembly building construction, and establish the assembly building standards and assembly rate indicators into the daily supervision and acceptance supervision content of the working mechanism. Enterprises that violate laws and regulations shall be punished in accordance with the law and regulations, and credit punishment shall be imposed. (Responsible units: District (Development Zone) People's Government (Administrative Committee), Municipal Urban Construction Bureau)
(IV) the establishment of a statistical reporting system for prefabricated building information, the people's governments of various districts and the functional departments of the city shall submit information on the establishment of prefabricated building projects, land transfer, construction drawing review, and completion acceptance to the office of the Municipal Construction Industry Modernization Leading Group every quarter. (Responsible units: Municipal Development and Reform Commission, Municipal Natural Resources Planning Bureau, Municipal Housing Management Bureau, Municipal Urban Construction Bureau, District (Development Zone) People's Government (Management Committee))
Prefabricated component manufacturers submit information on the type of production components, production line, design/actual production capacity, plant area, yard area and other information to the municipal construction industry modernization leading group office every quarter. (Responsible unit: people's government (administrative committee) of each district (development zone)) The specific submission requirements shall be notified separately.
(V) strengthen the product quality supervision and management of prefabricated building parts and component manufacturers, and carry out product quality supervision and spot checks with "double random and one open" as the main method according to our city's inspection capabilities. (Responsible unit: District (Development Zone) People's Government (Administrative Committee), Municipal Market Supervision Bureau)
4. carry out project demonstration and innovate development mode
(I) give full play to the leading role of prefabricated building model cities, organize the application, evaluation, identification and acceptance of prefabricated building demonstration projects, and strengthen the promotion and exchange of demonstration projects. (Responsible unit: leading group office, district (development zone) people's government (management committee))
(II) promote the general contracting (EPC) model in prefabricated buildings, and promote the application of building information modeling (BIM) technology in prefabricated buildings. (Responsible unit: Municipal Urban Construction Bureau)
(III) start the evaluation of prefabricated buildings, urge the construction unit to organize the completion acceptance of prefabricated buildings, verify the assembly rate index, and prepare the self-evaluation report of the assembly rate of prefabricated buildings as the completion acceptance data, and submit the completion acceptance information to the municipal and district construction management departments. (Responsible units: District (Development Zone) People's Government (Administrative Committee), Municipal Urban Construction Bureau)
5. strengthen market cultivation, strengthen the foundation of development
(I) actively support industrial bases to declare national demonstration bases, and guide qualified industrial bases to develop into modern industrial parks in the construction industry. (Responsible unit: District (Development Zone) People's Government (Administrative Committee), Municipal Economic and Information Bureau)
(II) cultivate a number of leading enterprises with the general contracting strength of assembly-type construction projects. (Responsible units: District (Development Zone) People's Government (Administrative Committee), Municipal Urban Construction Bureau)
(III) timely release of assembly building PC components comprehensive information price. Improve the assembly building parts information release mechanism, timely release of relevant information. (Responsible unit: Municipal Urban Construction Bureau)
The (IV) supports the prefabricated building branch of Wuhan Construction Industry Association to carry out star evaluation of precast concrete component production enterprises and strengthen the application of evaluation results, and guide precast concrete component production enterprises to further improve standards, strengthen management and improve the quality of precast components. (Responsible unit: Municipal Urban Construction Bureau)
6. Focus on Scientific Research, Strengthen Technical Support
(I) research and compilation of the "14th Five-Year Development Plan for Prefabricated Buildings in Wuhan", do a good job in top-level design, clarify development goals and main tasks during the "14th Five-Year Plan" period, build a Wuhan policy system, guide the establishment of an industrial system, and promote The upstream and downstream industries of prefabricated buildings continue to develop healthily. (Responsible unit: Municipal Urban Construction Bureau)
(II) gather the research forces of universities and enterprises, carry out technical research around the key technologies of prefabricated buildings and the urgent problems to be solved, increase the research on the cutting-edge technologies and major key common technologies of prefabricated buildings, and promote the scientific and technological innovation of our city's construction. (Responsible unit: Municipal Urban Construction Bureau, Municipal Science and Technology Bureau)
(III) organize the preparation of local standards and specifications, and establish a prefabricated building standard specification system covering the whole process of design, production, construction, testing, acceptance, operation and maintenance. (Responsible unit: Municipal Urban Construction Bureau, Municipal Housing Management Bureau)
7. increase personnel training, do a good job of propaganda and guidance
(I) strengthen the government management departments, enterprise management personnel and technical personnel assembly building policy and professional knowledge training, do a good job in professional and technical personnel continuing education, improve business ability. (Responsible unit: Municipal Urban Construction Bureau)
(II) and improve the training system for key positions in the construction of prefabricated buildings, simultaneously build training bases for key positions, increase practical skills training, and build a professional team of prefabricated technical workers. Encourage universities or enterprises with strength to take the lead in building training bases that meet the requirements of the industry. (Responsible units: District (Development Zone) People's Government (Administrative Committee), Municipal Urban Construction Bureau)
(III) increase the publicity of prefabricated buildings, make use of Internet news media, briefings and other extensive publicity, timely release the latest developments in the development of the prefabricated construction industry, and form a good public opinion environment; organize large-scale publicity meetings, forums and on-site observation meetings of demonstration projects, summarize and promote advanced experience, and improve public awareness. (Responsible unit: each member unit of the leading group)
8. strengthen overall coordination and improve the working mechanism
(I) implement territorial management, each district government must clarify the working mechanism of prefabricated buildings to ensure that prefabricated building projects are implemented. Strengthen departmental linkage, development and reform, natural resource planning, housing security housing management, market supervision, urban and rural construction and other departments should strengthen effective linkage, establish prefabricated building information exchange and sharing, and joint law enforcement mechanisms to form a regulatory force. (Responsible department: each member unit of the leading group)
The office of the (II) leading group carries out supervision and inspection on the promotion of prefabricated buildings from time to time to check the completion of objectives and tasks of each member unit, the implementation of policies and standards, and the promotion of projects and industrial bases. (Responsible department: each member unit of the leading group)
(III) strengthen the information submission, each member unit regularly submits the management information of each link of the project construction to the leading group office, forming a record of the whole process of the city's prefabricated building promotion work. Regularly hold overall work meetings, strengthen communication and cooperation, and study and solve problems in progress. (Responsible department: each member unit of the leading group)
(IV) speed up the construction of information technology, the establishment of prefabricated construction project data information platform, to achieve information transmission and sharing. (Responsible department: each member unit of the leading group)
Attachments:
Breakdown of tasks for the development of prefabricated buildings in 1.2021
2. Target Breakdown Table of New Prefabricated Construction Projects in Each District (Development Zone) in 2021
3. The city's subway tunnel enclosure structure target task decomposition.




Keywords:
Latest Updates
Contact Information
Phone:027-65521781(Office phone)
027-65521935(Calcium Silicate Board Division) /027-65522625(Decorative Panel Division)
Email:baifeng@sinoma-ec.cnlijie@sinoma-ec.cn
WeChat Official Account
WeChat Video Channels
Official TikTok
Product Color Chart